Quarry Direct Call

What are you building?

Farm road

An economical road base, compacted 150 to 200 mm deep, makes a track that stands up to utes, trucks and machinery.

Unspec Roadbase: brown roadbase with scattered grey stones

What you need

Tips

  • Build it up above the paddock with table drains each side, so water runs away from the road.
  • Set the calculator's depth to match: 150 mm for light use, 200 mm where trucks run.

How much you need

Enter your measurements, then price the tonnes delivered to your address.

Not sure what you need?

Call 0423 066 648